What is the actual time need to construct a Tensioned / Tensile Membrane Structure?

When it comes to have a tensile structure, most common questions comes upfront:

  1. How it is better from Traditional roofing structure
  2. Will it looks aesthetically appealing
  3. Will it occupy more space
  4. How long will it take to complete

Out of all the above, final question of “How long will it take to complete” is the crucial question in the current day scenario. Customer prefers to have a structural solution which is modern, light weight and versatile when compared to the traditional method.

Tensioned / Tensile Membrane structure is the union of art and engineering. It is modern, light weight, versatile, most advanced and easy to install be it small or bigger structures. Due to its immense benefit list of being light weight, transparency, fire resistant properties, life, cost effective etc were the most attractive points for the modern day architects and construction companies. Architects and construction companies has to face lot of hurdles at ground level (functional) and as well as at specification level (aesthetic) from the customer end. Establishing a Tensioned / Tensile Membrane starts from planning and analysis stage. Also we need to take into consideration on what type of structures and the ultimate need of it – temporary, semi-permanent and permanent structures.

Based on the type of the structure, the time, cost, process and final delivery will vary for Tensioned / Tensile Membrane Structure.

Some of the important aspects which contribute to the delivery timeline of the Tensioned / Tensile Membrane Structure:

  • Requirement Analysis and initial designs for the presentation
  • Approval, Cost Estimate and Negotiation Process
  • Final Design with respect to Engineering Analysis and Statutory Norms (Weather Resistance, Fire Proofing requirements, thermal properties, load considerations, form finding, dynamic equilibrium are considered)
  • Calculation, Analysis and Selection of the Material requirement as per the exact surveyed field measurements and design requirement (Metal type, Membrane type and GSM)
  • On receipt of materials, Fabric and Metals is cut and welded as per the measurements
  • Structural Concrete pillaring work at Site Location
  • Erection of the metal structure and installing the fabric membrane on the frame

Time Duration:

  • Small Projects such car parks, roof top shading, small canopies etc – will take 1.5 – 2 Months
  • Large Scale Projects such as stadiums, mega meditation halls, indoor stadiums etc – will take 3 – 4 Months